When to notify the Building Inspector

The Owner or Contractor must notify the Building Inspector when building is at inspection stage.

  • Stage One: Plan review
  • Stage Two: Site inspection – one time.
  • Stage Three: Foundation inspection
  • Stage Four: Framing and plumbing inspection
  • Stage Five: Final Inspection

A garage requires inspection at Stages 2, 3 and 5.